2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 30.00 LPA
Job Description: Fabrication Foreman (2-5 Years Experience)
Location: Jubail, Saudi Arabia Job Type: Full-time
Position Summary: We are seeking a skilled and experienced Fabrication Foreman with 2-5 years of experience to oversee and coordinate fabrication activities in our Jubail-based operations. The ideal candidate will have a strong background in metal fabrication, leadership ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
73.00 LPA TO 93.00 LPA
POSITION - Financial ControllerLocation - Brampton , ON (On Site)Industry - Steel / MetalCompensation - $120,000 - $150,000 CAD annually.
A well established, metal fabrication company (14 years, 150 employees) seeking a Financial Controller to manage all financial activities and contribute
to success in the custom metal fabrication and installation industry.
Position Overview
Reporting to ...
1 Opening(s)
5.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 21.60 LPA
Job Title: Sr Production and Planning control engineer
Experience- Minimum 5 years
Location: Dubai
Salary- 7000 AED
Job Responsibilities-
To Understand cycle time of each product, do machine loading and scheduling orders based on priorities.
Working on Raw Material RM required for project and share same with Stores to check availability and indenting
Share RM Consumption plan based on ...
5 Opening(s)
8.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Position Product Engineer
Location Winamac, Indianapolis
Full-time role
KNOWLEDGE, SKILLS, ABILITIES:
Mechanism Design knowledge is most, expertise preferred, and how to integrate it into the design, considering all Tolerances involved.
Understanding of Vehicle Engineering and Integration. Must know what is required for a reliable design.
Proficiency in Structural Design, sheet metal fabrication, welding processes, LEAN principles.
Understanding of ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
8.50 LPA TO 11.00 LPA
Technical Knowledge: 1.Powder coating system 2.Paint system 3.Blasting Process Knowledge: a. SOP(Standard Operating Procedure) and WI(Work Instruction) Drafting & Reading. b. Overall Equipment Effectiveness Concept and Calculation (OEE) c. RCA(Root Cause Analysis)/CAPA(Corrective Action & Preventive Action) Methodology d. Standards as per Quality Assurance Plan (ISO/ASTM) related to Welding activities e. ...