1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Conduct hydrological and hydraulic studies for natural drains, rivers, streams, and cross drainage structures along the proposed highway alignment.
Analyze historical rainfall data, runoff characteristics, catchment areas, and flood levels.
Prepare design discharge calculations for bridges, culverts, and causeways.
Recommend appropriate sizes and types of cross drainage and longitudinal drainage structures.
Liaise with structural ...