64 Job openings found

1 Opening(s)
20.0 Year(s) To 30.0 Year(s)
80.00 LPA TO 85.00 LPA
      Job Title: Deputy Project Director Location: Saudi Arabia Experience: Minimum 20 Years (with at least 5 Years in a Senior Strategic & Leadership Role) Industry: Infrastructure, Water Network, and Sewage Projects Salary Package: SAR 30,000 (Inclusive of Basic + Housing + Transport) Employment Type: Full-Time Role Overview: We are seeking an ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Seeking a Project Manager experienced in the construction of Cross-Country Pipelines. The ideal candidate should have deep experience in Engineering, Procurement and Construction of pipelines. Essential duties: Project Management Professional, Oversee and direct Overall project from conception to completion.       He shall have experience in Execution of Project from Conceptual Design, Detail Design, Procurement, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Direct and manage the Project Construction from IFC to Handing over Project. He shall have a minimum of 10 years of hands-on experience in construction of hydrocarbon facilities, Pipeline, Piping, Plant Process Equipment’s installation, structural, associated Civil, E & I and Pre-commissioning, Commissioning and Handover activities. In which he shall have ...
4 Opening(s)
15.0 Year(s) To 25.0 Year(s)
45.00 LPA TO 52.00 LPA
Position Construction Manager, experienced in the construction of Cross-Country Pipelines Job Location Saudi Arabia Year of Experience 15 years Education Engineering Roles & Responsibility ·        Direct and manage the Project Construction from IFC to Handing over Project. He shall have a minimum of 10 years of hands-on experience in construction of hydrocarbon facilities, Pipeline, Piping, Plant Process Equipment’s installation, structural, ...
5 Opening(s)
17.0 Year(s) To 23.0 Year(s)
60.00 LPA TO 80.00 LPA
  JOB DESCRIPTION POSITION: PROJECT MANAGER – AIRPORT PROJECTS Ensuring the project is completed on time and within budget, the project's objectives are met and everyone is doing their job properly, working together to achieve a set of specific objectives.  To ensure the desired result is achieved, the most efficient resources are used ...
5 Opening(s)
15.0 Year(s) To 25.0 Year(s)
48.00 LPA TO 59.70 LPA
Position QA Manager, experienced in the construction of Cross-Country Pipelines Job Location Saudi Arabia Year of Experience 10 years Education Engineer – preferred Mechanical Engineer Roles & Responsibility QA Manager (ARAMCO SAP No Preferred). University Degree Mechanical Background Minimum 10 years Inspection / QA/QC experience in oil and GAS.   1.      He should be aware of all Saudi Aramco and International standards, ...
2 Opening(s)
8.0 Year(s) To 20.0 Year(s)
0.00 LPA TO 70.00 LPA
Division PMT Position Project Manager, experienced in the construction of Cross-Country Pipelines Job Location Saudi Arabia Year of Experience 8 - 10 years Education Engineer – preferred Mechanical Engineer Roles & Responsibility Seeking a Project Manager experienced in the construction of Cross-Country Pipelines. The ideal candidate should have deep experience in Engineering, Procurement and Construction of pipelines. Essential duties: (1)   Project Management Professional, Oversee ...
5 Opening(s)
10.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 46.00 LPA
Position Construction Manager, experienced in the construction of Cross-Country Pipelines Job Location Saudi Arabia Year of Experience 10 years Education Engineer Roles & Responsibility ·        Direct and manage the Project Construction from IFC to Handing over Project. He shall have a minimum of 10 years of hands-on experience in construction of hydrocarbon facilities, Pipeline, Piping, Plant Process Equipment’s installation, structural, ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 60.00 LPA
Job Title: Project Manager Pipeline Qualification: Mechanical background Location: KSA Notice Period: Immediate to 30 days Salary : Gross 25 K Sar Job Summary: As a Project Manager with a pipeline mechanical background typically combines expertise in project management with in-depth knowledge of mechanical systems, specifically related to pipeline construction, maintenance, and operation. This ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
24.00 LPA TO 30.00 LPA
Job Responsibilities: Preparation of FEED documents and drawings. Preparation of DED documents and drawings. Preparation of Bid engineering estimates for the project. Preparation of Scope of work and Engineering man-hour estimate of the project. Preparation of Scope of Work, Basis of Design. Preparation of Construction Scope of Work for the Contractor. Attend Site Surveys with Clients and ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile